What is Scheduling and routing?

Scheduling:-

Scheduling determines the program for the operations. It is the fixation of time and date for each operation as well as it determines the sequences of operations to be followed. This program is prepared by the planning department.
What is Scheduling in engineering, What is Scheduling in project, Scheduling meaning
What is Scheduling?

Scheduling is presenting many different ways such as:-

1. Plane schedule management.
2. Define project activities.
3. Sequence activities.
4. Estimate resources.
5. Estimate duration.
6. Develop project activities.

The fundamentals of project scheduling.

1. What needs to be done?
2. When it will be done?
3. Who will do it?

Advantages of Scheduling:-

1. Tight deadlines keep you on track.
2. Scheduling in segments makes a large project more manageable.

Disadvantages of Scheduling:-

1. Tight deadlines add pressure.
2. Tight deadlines can lead to conflict.
What is Scheduling and routine, routing number, routing table
Scheduling and routine.

Routing:-

Routine may be defined as the selection of path which each part of the product will follow while being transformed from raw material to finished products.
Define routing, What is routing in industrial
Define Routing

The routing procedure consists of six dimensions.

1. Make decisions.
2. Bill of material.
3. Preparation of route sheet.
4. Lot size determination.
5. Determination of scrap factor.
6. To provide important and information and forms.

Advantages of Routing:-

1. Effective utilization of available resources.
2. Reduction and production costs.
3. Quality improvement occurs.
4. The productivity of the system improves.
5. provides a basis for loading and scheduling.